Loading…
sealvo.com · USPTO Trademark Record
https://sealvo.com/sconnex-79286919

USPTO Trademark Record
REGISTEREDSN 79286919·Reg 6610091·Filed Jan 28, 2020
Owner Schöck Bauteile GmbH
Common metals and their alloys, ores; metal materials for building and construction; transportable buildings of metal; non-electric cables and wires of common metal; small items of metal hardware; metal containers for storage or transport; safes.; Unprocessed and semi-processed rubber, gutta-percha, gum, asbestos, mica and substitutes for all these materials; plastics and resins in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, tubes and hoses, not of metal.; Materials, not of metal, for building and construction; rigid pipes, not of metal, for building; asphalt, pitch, tar and bitumen; transportable buildings, not of metal; monuments, not of metal.
SCONNEX (Serial No. 79286919), Registration No. 6610091, is a registered US trademark filed on Jan 28, 2020 by Schöck Bauteile GmbH. This trademark covers Class 006 (Common metals, their alloys & metal goods), Class 017 (Rubber, plastics & insulating materials), Class 019 (Non-metallic building materials).
SCONNEX (Reg. #6610091) is a registered US trademark that has been protecting its owner, Schöck Bauteile GmbH, since 2020. The mark covers Class 006 (Common metals, their alloys & metal goods), Class 017 (Rubber, plastics & insulating materials) and Class 019 (Non-metallic building materials) respectively. Goods and services include Common metals and their alloys, ores; metal materials for building and construction; transportable buildings of metal; n.... The mark faced 6 opposition proceedings during prosecution.
FILED
Jan 28, 2020
SERIAL
79286919
REG#
6610091
REGISTERED
Jan 11, 2022
Attorney
Bridget H Labutta Panitch Schwarze
208934.0316
2001 Market Street, Suite 2800, Philadelphia, PA 19103, UNITED STATES
AI attorney analyzes your proposed mark against USPTO — Go/No-Go verdict, class-by-class risks, and strategy recommendations.
FILED
2020
YEARS AGO
6y
CLASSES
3
MADRID FILINGS
—
Free USPTO lookups by name, owner, or serial number. No account needed.
CLASSES
3
OFFICE
USPTO
COUNTRY
US
Common metals and their alloys, ores; metal materials for building and construction; transportable buildings of metal; non-electric cables and wires of common metal; small items of metal hardware; metal containers for storage or transport; safes.
Unprocessed and semi-processed rubber, gutta-percha, gum, asbestos, mica and substitutes for all these materials; plastics and resins in extruded form for use in manufacture; packing, stopping and insulating materials; flexible pipes, tubes and hoses, not of metal.
Materials, not of metal, for building and construction; rigid pipes, not of metal, for building; asphalt, pitch, tar and bitumen; transportable buildings, not of metal; monuments, not of metal.
This description is as filed with the USPTO and defines the scope of trademark protection.
INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
Nov 09, 2023INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Nov 08, 2023PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
Apr 11, 2023NOTICE OF UPDATED REGISTRATION CONFIRMATION EMAILED
AMENDMENT UNDER SECTION 7 - PROCESSED
Mar 08, 2023AMENDMENT UNDER SECTION 7 - PROCESSED
CASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 01, 2023CASE ASSIGNED TO POST REGISTRATION PARALEGAL
TEAS SECTION 7 REQUEST RECEIVED
Sep 23, 2022TEAS SECTION 7 REQUEST RECEIVED
FINAL DECISION TRANSACTION PROCESSED BY IB
Jul 25, 2022FINAL DECISION TRANSACTION PROCESSED BY IB
CHANGE OF NAME/ADDRESS REC'D FROM IB
Jul 22, 2022CHANGE OF NAME/ADDRESS REC'D FROM IB
NEW REPRESENTATIVE AT IB RECEIVED
Jul 16, 2022NEW REPRESENTATIVE AT IB RECEIVED
FINAL DISPOSITION NOTICE SENT TO IB
Jun 23, 2022FINAL DISPOSITION NOTICE SENT TO IB
FINAL DISPOSITION PROCESSED
Jun 22, 2022FINAL DISPOSITION PROCESSED
FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Apr 11, 2022FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
REGISTERED-PRINCIPAL REGISTER
Jan 11, 2022REGISTERED-PRINCIPAL REGISTER
NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Nov 28, 2021NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Nov 10, 2021NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Nov 10, 2021NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
NOTIFICATION PROCESSED BY IB
Nov 04, 2021NOTIFICATION PROCESSED BY IB
PUBLISHED FOR OPPOSITION
Oct 26, 2021PUBLISHED FOR OPPOSITION
OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Oct 26, 2021OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Oct 06, 2021NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Oct 06, 2021NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Oct 06, 2021NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
APPROVED FOR PUB - PRINCIPAL REGISTER
Sep 23, 2021APPROVED FOR PUB - PRINCIPAL REGISTER
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Sep 20, 2021TEAS RESPONSE TO OFFICE ACTION RECEIVED
CORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 20, 2021CORRESPONDENCE RECEIVED IN LAW OFFICE
TEAS/EMAIL CORRESPONDENCE ENTERED
Sep 20, 2021TEAS/EMAIL CORRESPONDENCE ENTERED
NON-FINAL ACTION WRITTEN
Mar 19, 2021NON-FINAL ACTION WRITTEN
NON-FINAL ACTION E-MAILED
Mar 19, 2021NON-FINAL ACTION E-MAILED
NOTIFICATION OF NON-FINAL ACTION E-MAILED
Mar 19, 2021NOTIFICATION OF NON-FINAL ACTION E-MAILED
TEAS/EMAIL CORRESPONDENCE ENTERED
Jan 28, 2021TEAS/EMAIL CORRESPONDENCE ENTERED
TEAS RESPONSE TO OFFICE ACTION RECEIVED
Jan 27, 2021TEAS RESPONSE TO OFFICE ACTION RECEIVED
CORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 27, 2021CORRESPONDENCE RECEIVED IN LAW OFFICE
REFUSAL PROCESSED BY IB
Aug 14, 2020REFUSAL PROCESSED BY IB
REFUSAL PROCESSED BY MPU
Jul 29, 2020REFUSAL PROCESSED BY MPU
NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jul 29, 2020NON-FINAL ACTION MAILED - REFUSAL SENT TO IB
NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jun 18, 2020NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
NON-FINAL ACTION WRITTEN
Jun 17, 2020NON-FINAL ACTION WRITTEN
APPLICATION FILING RECEIPT MAILED
Jun 09, 2020APPLICATION FILING RECEIPT MAILED
NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 05, 2020NEW APPLICATION OFFICE SUPPLIED DATA ENTERED
ASSIGNED TO EXAMINER
Jun 05, 2020ASSIGNED TO EXAMINER
SN ASSIGNED FOR SECT 66A APPL FROM IB
Jun 04, 2020SN ASSIGNED FOR SECT 66A APPL FROM IB
Additional USPTO filings from the same owner.
Additional USPTO filings handled by the same attorney of record.